top of page

Been a busy week after the bank holiday weekend on this refurb. New front door, lintel  move and replacement, 1st fix plumbing for cloakroom in including hideaway cistern and boxing. 1st fix pipework for new kitchen with a water softener ready to go. Even had time to remove the garage door, brick up the reveals and fit the window. Very good shift from the gang assisting @jonjosephkitchens

1st fix plumbing and water softener

WIAPS WaterSafe
Water Safe
Gas Safe
OFTEC Heat Pump Accredited
Bpec
SMAS Accreditation
DBS Checked
bottom of page